23-017 Natural Gas Pipeline Construction at Regulator Station 2

Agency: Pensacola
Level of Government: State & Local
Category:
  • S - Utilities and Training Services
  • Y - Construction of Structures and Facilities
Opps ID: NBD10789109573727568
Posted Date: Mar 3, 2023
Due Date: Apr 17, 2023
Solicitation No: 23-017
Source: https://www.cityofpensacola.co...
Bid Title: 23-017 Natural Gas Pipeline Construction at Regulator Station 2
Category: Bids
Status: Open

Description:

The scope of work may include, but is not limited to, the following:

Steel Main Install - Will include trenching, final clean-up, restoration, and provide a completed pipeline system ready for gas distribution as herein specified and according to the attached PE facility map/drawing and specifications. Main shall be made live as soon as practical.

Steel to Steel Main Tie-in - Will include testing main, pigging line, installation of the necessary squeeze-off or steel appurtenances for gas control, as well as tapping through steel, and purging. Also includes final clean-up and restoration. All steel connections shall be welded connections (with no mechanical fittings).

Abandon Steel Main – Will include installation of the necessary fittings, squeeze-off or steel appurtenances for gas control, as well as tapping through steel, purging abandoned facilities, and capping lines, per PE standards, and final clean-up and restoration. This Item is only paid when retiring existing pressurized gas system per project design.

Dewatering pit/main line – Will include all equipment, labor, and provisions necessary to dewater when required for completion of work. All dewatering must adhere to requirements of Section 1.38 Environmental Hazards.

Publication Date/Time:
3/3/2023 8:00 am
Closing Date/Time:
4/17/2023 2:30 pm
Related Documents:

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >