Florida Bids > Bid Detail

Hurricane Loss Mitigation Program

Agency: Miami-Dade County
Level of Government: State & Local
Category:
  • A - Research and development
  • R - Professional, Administrative and Management Support Services
Opps ID: NBD10865629787707235
Posted Date: Jan 5, 2023
Due Date: Jan 13, 2023
Solicitation No: MCC 7360 RPQ HLMP-2022-ROOF
Source: https://www.miamidade.gov/apps...

Solicitation Details - MCC 7360 RPQ HLMP-2022-ROOF

Title:
Hurricane Loss Mitigation Program
Opening Date:
1/13/2023 2:00:00 PM
Announcement Info:
Re-roof Complete: various county home locations ROOFING GENERAL SPECIFICATION All repairs and/or installations of new roof system shall comply with requirements of the Miami-Dade County Building Department and The Florida Building Code Test Protocol for High Velocity Hurricane Zones. All valley and eave drip shall be replaced with new and secured with ring shank galvanized nails. Nails shall not penetrate through the sheathing at any visible spot. All plumbing flashing must be replaced with new lead flashing. And, vents and stacks protruding through the roof shall be replaced with new vents or stacks. End joints shall be made over rafters and all eves drip shall be backed with pressure treated 1*2 furring strips. NOTE #1 Include in your price for replacement of any damaged or deteriorated sheathing or framing members. NOTE #2 Contractors are responsible for providing all necessary protection from the weather during all phases of roofing operation. NOTE #3 Contractor is responsible for obtaining a separate plumbing permit for any gas flue vents, and permit must be obtained before the approval of the inspection for the roofing permit. NOTE #4 all materials, installation and inspections shall be in accordance with the Florida Building Code and approved by MDC product control division. NOTE # 5: Contractor will be responsible for water tight tie-in to existing shingle roof. All Low slope roofing (Labor and Materials) must be guaranteed for minimum of 10 years for Shingles and 5 years for Flat deck and Provide owner with manufactures warrantee. NOTE # 6 COMPLY WITH ALL HURRICANE MITIGATION RETROFIT REQUIREMENTS. SPECIFICATIONS FOR ROOF DECK REPAIRS: Include with your proposal the cost of replacing the first 100 SQ/FT of plywood roof deck. SPECIFICATIONS FOR SOFFIT AND FASCIA REPAIRS: Replace all fascia and soffits to match existing. No splicing shall be less than 5 ft. in length. All joints shall fall on framing and must be mitered at 45 degrees on runs and corners, no butt joints allowed. New wood to be primed and painted. Replace all continuous exhaust vents in soffits for roof ventilation. DISCOVERY OF HIDDEN DAMAGE: For all additional or hidden damage discovered after bid award, call a joint meeting with the Project Manager to determine actual quantities. Re-nail entire deck according to Code and replace defective or damaged sheathing with plywood or tong & grove as per code. Include in your bid first 100 Sq. Ft. of decking material Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detail Scope of Work.
Technical Certification:
General Building Contractor

Commodities
Code Description
90638 GENERAL CONSTRUCTION SERVICES
90930 BUILDING CONSTRUCTION (NOT OTHERWISE CLASSIFIED)
96820 BUILDING CONSTRUCTION
Solicitation Package/Addendums
Type File Name
Package MCC_7360_RPQ_HLMP-2022-ROOF.pdf

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >