Florida Bids > Bid Detail
PUR-RFP-23-1 NCB4 Rehabilitation and Modernization
Agency: | Canaveral Port Authority |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD17347952827654912 |
Posted Date: | Jan 23, 2023 |
Due Date: | Feb 14, 2023 |
Solicitation No: | PUR-RFP-23-1 |
Source: | https://www.portcanaveral.com/... |
PUR-RFP-23-1 NCB4 Rehabilitation and Modernization
Summary Description: The Canaveral Port Authority is seeking proposals from qualified marine contractors to construct a berth at North Cargo Berth 4, Port Canaveral Florida. The Work is generally described as follows: At North Cargo Berth 4, demolish the existing open pile pier and adjacent steel sheet pile wall system. Construct a new approximately 982 foot long deep combi-wall bulkhead berth with a prestressed concrete pile supported reinforced concrete relieving platform landside of the new berth wall. Project generally includes, cell fenders, bollards, shoreside mooring dolphins, earthwork and paving, stormwater conveyance system, potable water and force main wastewater utilities, high mast lighting system, fencing, and approximately 71,500 cubic yards of dredging with offshore disposal. The Request for Proposal (RFP) is a two step
Project Budget is $45,000,000 (U.S. Dollars) not including alternates if any.
PROPOSAL DUE DATE: February 14, 2023 @ 2:00 PM-EST (Eastern Standard Time)*
Summary Description: The Canaveral Port Authority is seeking proposals from qualified marine contractors to construct a berth at North Cargo Berth 4, Port Canaveral Florida. The Work is generally described as follows: At North Cargo Berth 4, demolish the existing open pile pier and adjacent steel sheet pile wall system. Construct a new approximately 982 foot long deep combi-wall bulkhead berth with a prestressed concrete pile supported reinforced concrete relieving platform landside of the new berth wall. Project generally includes, cell fenders, bollards, shoreside mooring dolphins, earthwork and paving, stormwater conveyance system, potable water and force main wastewater utilities, high mast lighting system, fencing, and approximately 71,500 cubic yards of dredging with offshore disposal. The Request for Proposal (RFP) is a two step
Step 1 is a Qualifications and Short-Listing Proposal process, and
Step 2 is a Price Proposal process. Participation in
Step 2 will be limited to
Step 1 Proposers who were successfully short-listed.
Project Budget is $45,000,000 (U.S. Dollars) not including alternates if any.
PROPOSAL DUE DATE: February 14, 2023 @ 2:00 PM-EST (Eastern Standard Time)*
- Solicitation Notice
- Link to VendorLink for Solicitation Documents (link will activate 1/23/23)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.