3040--SUPPLY: FY24-UPS Server Power Supply (IT)
Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159609097643375 |
Posted Date: | Mar 26, 2024 |
Due Date: | Apr 1, 2024 |
Solicitation No: | 36C24824Q0736 |
Source: | https://sam.gov/opp/1e70158a6d... |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Original)
- All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
- Original Published Date: Mar 26, 2024 08:46 am EDT
- Original Response Date: Apr 01, 2024 02:00 pm EDT
- Inactive Policy: Manual
- Original Inactive Date: Apr 11, 2024
-
Initiative:
- None
- Original Set Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Product Service Code: 3040 - MISCELLANEOUS POWER TRANSMISSION EQUIPMENT
-
NAICS Code:
- 335311 - Power, Distribution, and Specialty Transformer Manufacturing
-
Place of Performance:
C.W. Bill Young Veterans Medical Center Bay Pines , FL 33744USA
Background: Riello Uninterruptible Power Supply (UPS) Brand Name or Equal and connecting it to the existing UPS feeding the linear accelerator in the Radiation Oncology Clinic bldg. 107. The new UPS system will then have additional wiring installed to connect to a second linear accelerator. These services include furnishing all necessary parts, labor, and transportation for the equipment listed below as well as performing training on service of the new system. The Prime Contractor will be the single point of contact for the VA for this project and will take complete responsibility for delivering a fully functional Uninterruptible Power Supply supporting the two Linear Accelerators in bldg. 107. Testing of the full integrated system must be included after installation is complete. The contractor shall provide and install:
All products are required to be on station on or before 90 days ARO, and services to be completed within 30 days no later than sixty (60) after delivery of equipment. There are no restrictions on how early the medical center can accept this equipment system but unless otherwise specified, this contract will be for the entire period of delivery and installation of the equipment.
This solicitation will be a Fixed Price Total SDVOSB set aside.
- 8875 HIDDEN RIVER PARKWAY
- TAMPA , FL 33637
- USA
- Michael A Shook
- Michael.Shook@va.gov
- Phone Number 813-972-2000 Ext 2819
- Mar 26, 2024 02:36 pm EDT Solicitation (Original)
- Mar 26, 2024 08:46 am EDTPresolicitation (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.