Florida Bids > Bid Detail

23-026 2023 Sidewalk Phase 3

Agency: Pensacola
Level of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Opps ID: NBD10789074377349795
Posted Date: May 5, 2023
Due Date: Jun 6, 2023
Solicitation No: 23-026
Source: https://www.cityofpensacola.co...
Bid Title: 23-026 2023 Sidewalk Phase 3
Category: Bids
Status: Open

Description:
2023 SIDEWALK PROJECT PHASE 3McCLELLAN ROAD & HALLMARK DRIVE

Scope of Work – 4/19/2023

The scope of this project is the installation of ADA-compliant concrete sidewalks. The efforts associated with this project include, but are not limited to, excavation, removal/replacement of existing landscaping, mailboxes, water meters, water valves, site grading, installation of form work, concrete work, and sodding. All work shall be in accordance with the general notes, specifications, and construction plans included as part of this project manual. Below is the street name and limits of work for the proposed sidewalk. The contractor shall bid this project according to the constraints of the general notes, specifications, and construction plans. A site visit to determine any unforeseen issues is strongly recommended.

2023 SIDEWALKS PHASE 3 – NEW SIDEWALKS BASE BID LIST:

Street Name

From

To

McClellan Road

Hallmark Drive

Semur Road

Hallmark Road

McClellan Road

Tronjo Road

The lump sum maintenance of traffic item shall include all signs, devices and other costs associated with maintaining traffic during the construction including weekend work. No night work shall be permitted on this project.

Complete work under this contract shall consist of installation of required erosion control features (including sandbags), cover and protect storm water inlets, installation of new sidewalks, and placement of sod. All proposed line and grade work shall be approved by the City Inspector.

Contractor’s work shall include the necessary coordination of all existing utilities with respective owners and to timely address any potential conflicts with required work. All sod placed shall be properly watered and maintained until permanently rooted/established to the satisfaction of the City.

Maximum access shall be provided to the property owners at all times during construction. Care shall be exercised to not cause any damage to adjacent infrastructure being left in-place during reconstruction. Any such damage shall be the responsibility of the contractor.

All work shall be in accordance with the standards and specifications of the City of Pensacola.

Publication Date/Time:
5/5/2023 8:00 am
Closing Date/Time:
6/6/2023 2:30 pm
Related Documents:

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >