Florida Bids > Bid Detail

Deerfield Beach City Hall Building Hardening

Agency: Deerfield Beach
Level of Government: State & Local
Category:
  • 54 - Prefabricated Structures and Scaffolding
Opps ID: NBD17285856413606622
Posted Date: Sep 25, 2023
Due Date: Sep 29, 2023
Solicitation No: 23-17-BA

Bid Information



Type
Request for Proposals
Status
Issued
Number
23-17-BA Addendum 2 (Deerfield Beach City Hall Building Hardening)
Issue Date & Time
8/7/2023 11:46:16 PM (ET)
Close Date & Time
9/29/2023 02:00:00 PM (ET)
Time Left
3 days 17 hours 45 minutes 20 seconds
Notes
The City of Deerfield Beach is soliciting sealed responses from qualified vendors for the Deerfield Beach City Hall Building Hardening i n accordance with the terms, conditions, scope of work, plans and technical specifications of the above mentioned Request for Proposals.

Contact Information
Name
Bogdan Avasilaoe Purchasing Manager
Address
401 SW 4th Street
Deerfield Beach, FL 33441 USA
Phone
(954) 480-4486
Fax
Email




Bid Documents







Document name Format


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



1 items in 1 pages

Bid Invitation (please login to view this document)

Acrobat / PDF


Bid Attachments





















File Name Description File Size


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



18 items in 2 pages

23-17-BA Request for Proposals Package..pdf (please login to view this document)
Request for Proposals Package 436 KB

23-17-BA Exhibit I - Tentative Schedule of Events (Part of Addendum 2).lsx.pdf (please login to view this document)
Exhibit I - Tentative Schedule of Events (Part of Addendum 2) 47 KB

23-17-BA Exhibit II - Architectural Plans..pdf (please login to view this document)
Exhibit II - Architectural Plans 27.88 MB

23-17-BA Exhibit III - Project Scope.pdf (please login to view this document)
Exhibit III - Project Scope 78 KB

23-17-BA Exhibit IV - Scope of Work (Part of Addendum 2).pdf (please login to view this document)
Exhibit IV - Scope of Work (Part of Addendum 2) 1.96 MB

23-17-BA Exhibit V - Davis Bacon Prevailing Wages 1-6-23 (Part of Addendum1).pdf (please login to view this document)
Exhibit V - Davis Bacon Prevailing Wages 1-6-23 (Part of Addendum1) 71 KB

23-17-BA Exhibit VI - Zoom Link Recording Non-Mandatory Pre-Proposal Conference.docx (please login to view this document)
Exhibit VI - Zoom Link Recording Non-Mandatory Pre-Proposal Conference 12 KB

23-17-BA Attachment A - Vendor Performance Ref. Verification Survey Form.pdf (please login to view this document)
Attachment A - Vendor Performance Ref. Verification Survey Form. Verification Survey Form. This Form shall be completed by your five (5) references and provide it with you response attachments. 148 KB

23-17-BA Attachment B - Bid Bond.pdf (please login to view this document)
Attachment B - Bid Bond. Bid Bond must be received prior to the competitive solicitation closing date and time as a condition of responsiveness, and shall either be mailed or hand-delivered to the Purchasing and Contract Administration Division, 401 SW 4th Street, Deerfield Beach, FL 33441 (Central City Campus, Bldg. A., 2nd Floor) during normal business hours (8:00 a.m. to 4:30 p.m. Monday through Friday, excluding holidays observed by the City). Offerors who do not submit a bid security prior to the competitive solicitation close date and time, their response shall be deem as non-responsive and rejected from the award. 48 KB

23-17-BA Attachment C - Background Check Affidavit.pdf (please login to view this document)
Attachment C - Background Check Affidavit. THIS DOCUMENT IS NOT REQUIRED WITH THE RESPONSE. THIS DOCUMENT SHALL BE EXECUTED BY THE SUCCESSFUL OFFEROR PRIOR TO COMMENCING THE WORK. 70 KB

23-17-BA Attachment D - E-Verify Compliance Verification Form.pdf (please login to view this document)
Attachment D - E-Verify Compliance Verification Form. This form shall be completed and submitted with your response. 140 KB

23-17-BA Attachment E - Statement of Compliance Davis - Bacon Act.pdf (please login to view this document)
Attachment E - Statement of Compliance Davis - Bacon Act. This form shall be completed and submitted with your response. 55 KB

23-17-BA Attachment F - Statement of Compliance Byrd Anti-Lobbying.pdf (please login to view this document)
Attachment F - Statement of Compliance Byrd Anti-Lobbying. This form shall be completed and submitted with your response. 114 KB

23-17-BA Attachment G - Statement of Compliance SBE-MBR-WBE.pdf (please login to view this document)
Attachment G - Statement of Compliance SBE-MBR-WBE. This form shall be completed and submitted with your response. 56 KB

23-17-BA Attachment H - Financial Plan, Capital, Capabilities Form.pdf (please login to view this document)
Attachment H - Financial Plan, Capital, Capabilities Form. This form shall be completed and submitted with your response. 87 KB



Bid Questions
















Question

Request to have my guy get on the roof & core it to determine the composition & thickness of the existing roof material.


Answer No coring of roof is allowed for this RFP.
Submitted 9/8/2023 01:16:34 PM (ET)


Question
Please provide R-VALUE of new tapered insulation.
Answer

This is as required by Building Code.

Submitted 8/30/2023 03:36:30 PM (ET)


Question
Please confirm that item 1600 on A1.0 does not apply to the project scope. IF it does, please provide the plans it references.
Answer

This only applies for removing, storing, cleaning and reinstalling any mechanical or electrical equipment of fixtures temporarily removed during demolition that are to be reused.

Submitted 8/30/2023 11:49:16 AM (ET)


Question
Clarify Item 26 under General Demolition notes regarding the removal of furring from perimeter walls.
Answer

  • The intent is to comply with Energy code for all perimeter wall insulation required

Submitted 8/30/2023 11:37:33 AM (ET)


Question
Should the Contractor include costs for removing/replacing landscaping that is in conflict with the scope of work or will the City handle that through their allowance?
Answer

It is the contractor’s responsibility to remove and restore.

Submitted 8/30/2023 11:31:11 AM (ET)


Question
For the windows/storefront doors are their required energy values/calcs or a required color/tint?
Answer

Tint is Clear, refer to window schedule A 6.0

Submitted 8/30/2023 11:24:47 AM (ET)


Question
There are no panic bars shown on the doors. Are these required? If required, please provide hardware detail and identify doors.
Answer

Refer to hardware schedule on A6.0

Submitted 8/30/2023 11:23:35 AM (ET)


Question
Many of the windows, especially the ones at street level, have what appears to be a security screen. These will need to be removed to install the new windows. Is it the intent to replace these either originals or new? If replace, please provide NOA and related model/detail
Answer

No, the screens go away – hurricane impact rated windows take the place of these screens.

Submitted 8/30/2023 11:21:35 AM (ET)


Question
Will the City install/connect the access control pads listed on the Hardware Schedule? IF no, please provide a low voltage wiring detail and connection point location(s)
Answer

All access control is by separate contractor.

Submitted 8/30/2023 11:08:53 AM (ET)


Question
Will the City provide the access control pads listed on the Hardware Schedule? If no, please provide required Model information.
Answer

All access control will be by separate contractor. Requirements of this contract is to ensure the ability to run access control to hardware.

Submitted 8/30/2023 11:07:28 AM (ET)

Items 1 - 10 shown of 28 • Page 1 of 2 shown

First 1 2 3 > Last




TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >